205 Tower update: Design Review filed for former Sushi Maru corner
Architecture, Pacific Northwest architects, Ming Zhang, MZA, MZA Architecture, Multi-family architecture, Office architecture design, Civic architecture design, Civic projects, Interior design, Retail building design, Master planning design, Bellevue architects, Seattle architects, Shanghai architects, Chinese architects, Award-winning architecture and design
25062
wp-singular,post-template-default,single,single-post,postid-25062,single-format-standard,wp-theme-bridge,theme-bridge,bridge-core-2.0.2,woocommerce-no-js,ajax_fade,page_not_loaded,,qode_grid_1400,hide_top_bar_on_mobile_header,columns-4,qode-theme-ver-19.0.2,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-8.0.1,vc_responsive

205 Tower update: Design Review filed for former Sushi Maru corner

October 07, 2025

Downtown Bellevue Network

Original Article by Kara


 


Our 205 Tower project at 205 105th Ave NE has submitted for Design Review with the City of Bellevue. The latest filing outlines a 24-story mixed-use tower with homes above active street-level retail and on-site parking. As shared in the article, the team is targeting a fall 2026 start.

Shaped by our Rooted in Resilience approach, the tower meets the city with a welcoming corner plaza, three flexible retail bays, and a public route that lifts to a second-level terrace via a grand stair and an elevator. Canopies, slender guardrails, and warm lighting extend the plaza language around the corner for year-round comfort. A crafted terracotta base gives the pedestrian edge texture and warmth, while screened podium facades allow natural ventilation and keep the parking visually quiet.